Featured Posts

WMS Panel Assesment ADNOC 01082024

  WMS Panel Assessment Main Questions 1. Introduce yourself briefly and what is the main role/responsibility as PA/JP? Self introduction exa...

BLANTERWISDOM101

Recent Posts

Temporary Defeat (TD)

Temporary Defeat (TD)

What is Temporary Depeat (TD)? "TD is HSE Critical Equipment Securuty is taken out of service while the plant remains in operation...
Permit To Work (PTW)

Permit To Work (PTW)

  Permit To Work (PTW) PTW Module Agenda • Introduction What is a PTW? When is PTW needed? eWMS and Crash Pack • Purpose and scope • Relatio...
WMS Components

WMS Components

  WMS Components The WMS is an eight (8) step process that integrates all five (5) elements of WMS i.e., Permit to Work (PTW), Job Safety An...
Job Performer (JP)

Job Performer (JP)

Job Performer (JP) A Job Performer (JP) is responsible for the acceptance of a permit and supervising the safe conduct of the work activitie...
Performing Authority (PA)

Performing Authority (PA)

Performing Authority (PA) A competent person within the PTW System (employee or contractor as applicable), assigned to request a permit or s...